Area is connected to the superior system with two connectors 110kV V 8881 a V 8882.
Transformer stations are currently running on 2 x 25 MW. Upper limit of the capacity extension is 80MW (both).
At this point the Danube Data Center could be build from 10MW to 80MW, with same amount of backup.
Additional possibility of backup with our own electricity production up to 30MW.
Connection is equipped with two transformers as follows:
The original HV distribution system is built on a voltage level of 6.3kV
Reconstruction of the supply fields and transformers in 2015 give us possibility to connect to the area distribution system VN 22 kV.